Coleraine Harbour Commissioners
Local Notice to Mariners
No 1/26
BREAKWATER REPLENISHMENT WORKS
MARINERS ARE ADVISED THAT THE PLANNED
REPLENISHEMENT WORKS WILL BE CARRIED OUT TO THE
WEST AND EAST ‘BARMOUTH PIERS’ AT THE ENTRANCE OF THE RIVER BANN.
THESE ESSENTIAL WORKS AND WILL BE CONDUCTED FROM A BARGE ON THE INSIDE OF THE RIVER AT THE ENTERANCE TO THE RIVER BANN FROM 6TH MARCH 2026 TO 30 TH JUNE 2026.
ALL VESSELS WISHING TO TRANSIT THE AREA DURING
THIS TIME SHOULD NAVIGATE WITH EXTREME CAUTION AND PROCEED AT A SLOW SPEED WITH A MINIMUM WASH.
MARINERS ARE ADVISED IF ENTERING OR EXISTING THE
ENTRANCE TO THE BARMOUTH PLEASE CONTACT THE
BARGE MASTER ON VHF CHANNEL 6 TO ENSURE SAFE
NAVIGATION.
IF YOU HAVE ANY OTHER QUESTIONS OR QUERIES, PLEASE CONTACT THE HARBOUR OFFICE ON 028 7034 2012.
LISA MCLAUGHLIN
HARBOUR MASTER
COLERAINE HARBOUR COMMISSIONERS
3RD MARCH 2026
