MARINERS ARE ADVISED THAT PLANNED MAINTENANCE WORKS WILL BE CARRIED OUT TO THE RAILWAY BRIDGE ON SUNDAY 7TH JUNE 2026 AND MONDAY 8TH JUNE 2026 BETWEEN 2300 AND 0430 HOURS.
ALL VESSELS WISHING TO TRANSIT THE AREA DURING THIS TIME SHOULD NAVIGATE WITH CAUTION AND PROCEED AT A SLOW SPEED WITH A MINIMUM WASH.
LISA MCLAUGHLIN
HARBOUR MASTER
COLERAINE HARBOUR COMMISSIONERS
1ST JUNE 2026
